Lossiemouth East Beach is a major tourist attraction and therefore has significant importance to the local economy. The existing bridge over the river was closed due to structural defects and therefore required replacement.
After an initial commission of a geotechnical desk study the scope was expanded to include:
We were able to provide a single point of contact for all geotechnical issues and thereby streamline the process.
We worked with the Client and our supply chain to modify existing plant and cross the River Lossie in a pragmatic and cost-effective manner. This involved meticulous planning with respect to tide times.